Express News | The lithium ore sector fluctuated and rebounded, and Sichuan power rose and stopped
The A-share lithium battery sector boosted Huabao Xinneng by more than 15%
Gelonghui, April 29 | Huabao New Energy rose more than 15%, while Grimmie, Chuaneng Power, Changyuan Lithium, Fulin Seiko, and German Nano rose more than 5%.
Chuanneng Power (000155.SZ): The subsidiary plans to establish Sichuan Energy Investment Tongjiang New Energy Development Co., Ltd. with relevant parties
On April 28, Gelonghui Power (000155.SZ) announced that its subsidiary Sichuan Energy Investment Wind Power Development Co., Ltd. plans to jointly invest with relevant parties to establish Sichuan Energy Investment Tongjiang New Energy Development Co., Ltd., with a registered capital of 250 million yuan. After the establishment of the project company, it was responsible for the approval, investment approval, development and construction of the 270MW Xinglong wind farm project in Tongjiang County, Bazhong City.
Chuanneng Power (000155): Green Power plans to increase and launch a mid-term dividend
Net profit to mother in 2023 was +12% year on year, and the target price was raised. Chuaneng Dynamics released an annual report. In 2023, it achieved revenue of 3.31 billion yuan (-13% year over year), net profit to mother of 797 million yuan (+12% year over year), deducting non-net profit
Express News | Chuaneng Power and others set up a new energy development company for 50 million yuan
Chuanneng Power (000155.SZ): Up to now, it has put into operation 1.02 million kilowatts of wind power, 23,86 million kilowatts of photovoltaics, and 156,500 kilowatts of waste power generation
Gelonghui, April 18 | Chuanneng Power (000155.SZ) said on the investor interactive platform that the company's new energy power generation projects are mainly in Liangshan Prefecture, the mining project is in Aba Prefecture, and the wildfires in Ganzi Prefecture have no real impact on the company's related projects. Up to now, the company has put into operation 1.02 million kilowatts of wind power, 23,86 million kilowatts of photovoltaics, and 156,500 kilowatts of waste power generation. In addition, at the end of 2023, the company received a total of 1.1 million kilowatts of photovoltaics from Ganzi Prefecture and Aba Prefecture, and 700,000 kilowatts of wind power resources from Liangshan Prefecture and is currently carrying out preliminary work.
Chuanneng Power (000155.SZ): Lijiagou lithium mine project is still under construction
Gelonghui, April 18 | Chuanneng Power (000155.SZ) said on the investor interactive platform that the Lijiagou lithium mine project is still under construction, and trial mining production was carried out in 2023. Earnings during the trial production period can be found in the 2023 annual report to be disclosed by the company on April 27. The Lijiagou project is a lithium ore mining project, associated with rare metals such as tantalum, niobium, beryllium, and tin ore.
Chuaneng Power (000155.SZ): Currently no hydrogen energy business plans
Gelonghui, April 18 | Chuaneng Power (000155.SZ) said on the investor interactive platform that the company currently has no hydrogen energy business plans.
Express News | Sichuan Luqiao's Shuneng Mining 50,000 tons/year lithium iron phosphate project put into operation
China Post Securities: PLS lithium concentrate auction price of 1,200 US dollars/ton lithium continues to fluctuate at a high level
The Zhitong Finance App learned that China Post Securities released a research report saying that the PLS announcement had accepted the offer before the BMX auction. The price of 5,000 tons of lithium concentrate was 1106 US dollars/ton SC5.5, equivalent to 1,200 US dollars/ton SC6, and the equivalent cost of lithium carbonate was about 106,000 yuan/ton. A sales contract has been signed with the buyer and shipped in 2024Q4. In terms of the domestic market, judging from the production schedule, the downstream battery industry is booming. The March production schedule continued to grow month-on-month, and the April production schedule is still improving after learning about the industry chain. In addition, the industry was previously in a state of low inventory, and some manufacturers during the Spring Festival
Express News | China Post Securities: The inflection point of lithium carbonate highlights priority lithium ore recommendation
Chuanneng Power (000155): The advantages of new energy power generation are obvious, and the Lijiagou lithium mine is progressing steadily
Key investment points Q4 Net profit improved month-on-month, and the wind power business continued to grow. The company released a performance forecast. Net profit attributable to mother in 2023 was 70,000-780 million yuan, a year-on-year change of -1.38% to 9.89%. Net profit after deducting non-return to mother was
Chuanneng Power (000155.SZ): Main business is new energy power generation and lithium industry
Gelonghui, Feb. 8 | Chuanneng Power (000155.SZ) said on the investor interactive platform that the company's main business is new energy power generation and lithium industry, where the revenue from the power generation business is stable and guaranteed, and the performance grows with the commissioning of new construction projects. Although the lithium industry business is highly cyclical and price fluctuations have a great impact on performance, the company's industrial synergy will gradually be reflected in operating advantages and operating benefits.
Chuanneng Power (000155.SZ): Currently, the main projects under construction include Lijiagou lithium mine, Dea lithium salt, and Ganzi and Aba wind power and photovoltaic projects
Gelonghui, Feb. 8: Chuanneng Power (000155.SZ) said on the investor interactive platform that the company is currently constructing mainly projects such as Lijiagou lithium mine, De'a lithium salt, and Ganzi and Aba wind power and photovoltaics. According to preliminary estimates, the company is expected to achieve net profit of 7-78 billion yuan in 2023.
Chuanneng Power (000155.SZ): Up to now, the company has put in operation more than 1.2 million kilowatts of wind power
Gelonghui, Feb. 8: Chuanneng Power (000155.SZ) said on the investor interactive platform that up to now, the company has put in operation more than 1.2 million kilowatts of wind power (Huidong Xiaojie and Lutang Phase II wind power projects totaling 280,000 kilowatts have been completed and put into operation). The company also recently obtained a total of 1.1 million kilowatts of photovoltaics in Ganzi and Aba in Sichuan Province, and 700,000 kilowatts of wind power resources in Liangshan. Related work is underway.
Express News | Chuanneng Power: At present, the mining project of the Lijiagou lithium mine project has begun trial production
Chuaneng Power (000155.SZ): Snow and ice weather has little impact on production in the mining section
On January 31, 2024, Gelonghui Power (000155.SZ) was surveyed by specific subjects on January 31, 2024, on “Does winter affect production in Lijiagou?” The company replied that snow and ice weather had little impact on production in the mining section. At the same time, due to the company's optimization of the project construction plan, the flotation section of the beneficiation plant was moved down to Goukou, Lijiagou. The number of production days per year was increased from 270 days to 330 days, further reducing the impact of the snow and ice season on the production of the Lijiagou project.
Chuanneng Power (000155.SZ): At present, the mining project of the Lijiagou lithium mine project has begun trial production
Gelonghui Feb. 1: Chuanneng Power (000155.SZ) was surveyed by a specific target on January 31, 2024. “What is the current construction progress of the Lijiagou lithium mine?” The company replied that at present, the mining project of the Lijiagou lithium mine project has begun trial production. Some workshops and piping systems of the surface harvesting project are carrying out joint testing with materials, equipment commissioning and elimination work, and construction of projects such as tailings depots, production support facilities, and living facilities is progressing normally according to plan.
Chuanneng Power (000155.SZ): Since the beginning of 2023, additional Huidong Xiaojie and Lutang Phase II wind power projects totaling 280,000 kilowatts have been completed and put into operation
On January 31, 2024, Gelonghui Power (000155.SZ) was surveyed by a specific target on January 31, 2024, on “The company's wind power business situation and resource reserves in 2023?” The company replied that since the beginning of 2023, the new Huidong Xiaojie and Lutang Phase II wind power projects totaling 280,000 kilowatts have been completed and put into operation. The company has also recently obtained a total of 1.1 million kilowatts of photovoltaics in Ganzi Prefecture and Aba Prefecture, and 700,000 kilowatts of wind power resources in Liangshan Prefecture, and related work is ongoing. In the future, the company will rely on other energy projects under the controlling shareholder Sichuan Energy Investment Group to allocate and obtain more new energy resources and propose
Chuanneng Power (000155.SZ): Expected net profit for 2023 is 700 million yuan to 780 million yuan
Gelonghui, Feb. 1 | Chuanneng Power (000155.SZ) announced the 2023 operating results reminder. Net profit attributable to shareholders of listed companies during the reporting period was 70 million yuan to 780 million yuan, a change of -1.38%-9.89% over the same period of the previous year; net profit after deducting non-recurring profit and loss was 66,000-740 million yuan, a change of -0.02% -12.10% over the same period last year; basic earnings per share were 0.47 yuan/share -0.53 yuan/share. During the reporting period, the company's Huidongxiaojie wind power project (with an installed capacity of 160,000 kilowatts) continued
No Data